Rekind (Industrial engineering) engaged in construction on EPC (Engineering, Procurement, Construction) projects are activities ranging from civil and structural work, tank fabrication, piping work, electricity and instrument etc. From the work of each of these disciplines there are activities that require welding, sand blasting, painting and liquids to clean the outer rust (pickling), Majun that has been used, chemical liquids for internal cleaning of installed pipes, used lubricants. In this EPC, work causes waste, which cannot be allowed. In addition, if the company does not realize that the waste produced is simply thrown into the liquefaction system without any processing process. It will have a negative impact on the environment and human life. Given the magnitude of the risks and their impacts, efforts to manage B3 waste on construction activities are directly under the responsibility of the construction manager of PT Rekind and are coordinated by the HSE (Health, Safety, Environment). For this reason, we should know how to manage B3 waste in EPC activities at PT. Rekind through incinerator technology. So the study method carried out is an engineering research method or the method of management activities through the Type Rotary Kiln incinerator technology, where the management of B3 waste materials from the activity begins to mark the place where the B3 storage produces for a maximum of 90 days and transportation to treatment from the storage of B3 Waste. Rotary Kiln type incinerator technology is a two-stroke combustion process with various types of B3 waste materials, the first Combustion Chamber is for waste and the second Combustion Chamber is for the remnants of rudimentary gases burning in the Primary Chamber and lower temperatures are often needed to prevent the slagging of certain waste materials. The ash produced during the combustion process is discharged through the bottom of the second combustion chamber. So that the purpose of this study is to produce new material in the form of ash, which can be reused into fertilizer and others.

Keywords


Abidin, NZ & dan Powmya, A 2014, Green construction in Oman: Progress and Implementation Barriers.  International journal of sustainable construction engineering and technology, 5:1.  http://penerbit.uthm.edu.my/ojs/index.php/IJSCET/article/view/867, diakses 19 January 2017        
Alwi, S, Hampson, KD, dan Mohamed, SA 2002, Non value-adding activities in Australia construction
Amalia, RM & Utami, DY 2018, Rewarding based on performance appraisal employees with a HP method at pt. anugerah protecindo. Journal of Science Computer Knowledge and Technology, 3: 181–188. Retrieved from http://jitk.nusamandiri.ac.id/index.php/jitk/article/view/9
Ashari, D 2018, Practical guidelines understanding financial statements, managerial finance, DOI: 10.1108/MF-08-2017-0303.
Bakhshipour, A, Bagheri, I, Psomopoulos, C, Zareiforoush, H 2021, An overview to current status of waste generation, management and potentials for waste-to-energy (Case study: Rasht City, Iran). Caspian Journal of Environmental Sciences, 19: 159-171.
Bossik, BH & Browers 2013, Construction waste: Quantification and source evaluation. Journal of Construction Engineering and Management, 2, Ministry of National Education (2015). Industrial Hygiene Guide. Jakarta
Chaib, H, Hamouda, A, dan Muanwin, MA 2014, Household Hazardous Waste Management in Malaysia. International Journal of Advanced Research in Electrical Electronics and Instrumentation Engineering, 3:12.
Hans Christian, FT UI, 2008, Burner system modified and flow testing fluid bed incinerator UI, Jakarta
Hoarding Hazardous and Toxic Material Waste at the Final Boiling Facility.
http://www.pollutionissues.com/Ho-Li/Incineration.html#ixzz7ZMXyti4ihttp://www.pollutionissues.com/Ho-Li/Incineration.html includes reduction, storage, collection, processing, utilization, hoarding and/or raising of B3 waste and articles (58-61) on the protection and management of the environment.
Institution of the Ministry of Environment, According to Law No. 32/2009 on Environmental Protection and Management, PP No. 18/1999 on B3 Waste Management, PP No. 85/1999 on Amendments and PP No. 18/1999 ON PP RI No. 101/2014 on B3 Waste Management. Said that the guidelines should be implemented with a moderate level of law enforcement in the management of B3 waste.
Oloruntade, AJ, Adeoye, PA & Alao, F, 2013, Municipal solid waste collection and management strategies in Akure, South-Western Nigeria.  Caspian Journal of Environmental Sciences, 11: 1-10.
Permen, LH No. 14 of 2013 and Regulation of the Minister of Environment and Forestry of the Republic of                Indonesia Number P.63/Menlhk/Setjen/KUM.1/7/2016 Concerning Requirements.
PP No. 101 of 2014, B3 waste management and Government Regulation No. 101 of 2014 concerning Hazardous Material Waste Management and Poisonous, Project development, Unissula, 50: 127.
Rekind 2020, Creating excellence solutions for sustainable development. PT. Rekayasa Industries.
Riyanto 2013, Hazardous Toxic waste (B3 Waste), Deep Publish, Yogyakarta.
Sugiyono 2013b Quantitative, Qualitative and R & D research methods. Bandung: Alfabeta, CV
Suparmoko 2000, State Finance: Theory and Practice. BPFE-Yogyakarta.
United Nations Environmental Programme (UNEP) 2010, Waste and Climate Change: Global trends and strategy framework.
Tavakoli, B & Bagheri Zonoz, F 2014, Effect of cash subsidy on the quantity of domestic waste (Case study: Rasht, North of Iran). Caspian Journal of Environment Sciences, 12: 147-153.
Van Guilder, HD, Vrana, KE & Freeman, WM 2008, Twenty-five years of quantitative PCR for gene expression
 Yulinah, T, B3 Waste Management 2016, Technosain, Ruko Jambusari; 7 A Yogyakarta 55283.